Working on the initial foundations and main structure of the villas, we exceed the regulatory standards by using C25 cement not C20. We also blend liquid insulation to the mix for additional protection as this is such a vital element of the construction process.
|
|
Next we apply a complete layer of insulation which in itself is guaranteed by the manufacturer to be 95% effective. The swimming pool is also doubly insulated, as after all, this is always full of water!
|
For each storey, we use metal not wooden moulds for creating the supporting corner pillars to give a smoother, cleaner finish. Each storey is rested to allow the concrete to settle and dry out before commencing on the next storey.
|
The stone cladding, walls and arches are constructed using local natural stone, hand carved by local craftsmen and intricately placed for strength and grouted into place to give a perfect flush appearance.
|